Assisgment on Under-frequency Load Shedding (UFLS) Scheme
$350-400 HKD
Cancelled
Posted over 8 years ago
$350-400 HKD
Paid on delivery
To design the load shedding block size for each stage of the UFLS scheme to minimize the total load shedding amount while ensure the frequency recovery to the acceptable frequency range under all tested system contingencies.
Detail in Mini-Project Brief attachments.
A report within 5-10 pages about 3 days.