Combine heat power plant - open to bidding

Completed Posted Nov 21, 2013 Paid on delivery
Completed Paid on delivery

The process must be according to this:

Process 1-2: The working liquid is pumped from low to high pressure.

Process 2-3: The high pressure liquid enters a boiler where it is heated at constant pressure by an external heat source to become a dry saturated vapours.

Process 3-4: The dry saturated vapor expands through a turbine , generating power. This decreases the temperature and pressure of the vapours, and some condensation may occur.

Process 4-1: The wet vapours then enters a condenser where it is condensed at a constant pressure to become a saturated liquid

Process 4-5: The wastage heat passes through heating condenser and then to raise its temperature it passes through hot water and then it utilize for different purposes.

I want the project on Matlab (simulink) with proper parameters. the project should be according to the file which i attached. PID controllers must required before and after every equiment. i need this project with in 2 days.

Matlab and Mathematica

Project ID: #5152322

About the project

1 proposal Remote project Active Nov 23, 2013

Awarded to:

bchandra1955

I am expert in analysis and simulation area, and I am using MATLAB since past 10 years,.............................................Professional engineer with 36 years of experience can help you

$80 USD in 3 days
(28 Reviews)
4.9