I would like a detailed project management plan and construction methodology for the construction of a 200MW Coal Fired Power Station. The Scope Requirements are: Land Preparation done by others Piling of Piles 33metres down into soil to reach bedrock - the aim here is quickest method of piling for construction Civil Foundations Preparation off site of 10,000Tonnes of structural steel work to be fabricated in Asia and shipped to site in modules. Arrival unpacking, handling and sorting of Pre-Assembly steel work. Construction of Housing building Construction on site of the Boiler Placement of Power station equipment Detailing methodology of multiple workfront CFPP Power Plant CTG Power Plant Cooling Water System (intake and exhaust) Base Camp Car Parks Site Facilities Ash Storage Facilities Commissioning. methodology can detail off site and off site fabrication methods to make the time on the ground run alot smoother and faster during a 40+ Month construction period. Seeking applicant with strong civil, mechanical engineering or project management background with exposure to the power construction industry
Project ID: 5844780

About the project

7 proposals
Remote project
Active 10 yrs ago

Looking to make some money?

Benefits of bidding on Freelancer

Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
7 freelancers are bidding on average $2,087 USD for this job
User Avatar
Hello, I am interested in the proposed project. I have over 9 years of experience in project management, with previous jobs accomplished with Freelancer in this area. Based on my extended practical experience I can provide professional support for the needed project management. In order for the project plan, project gantt, WBS, budget, etc to be developed, it will be needed also the support from one person knowing the overal project information and activities. Considering the project dimensions, I consider that a minimum one month time frame is needed for the initial project manegement documentation set-up, and this is why I offered my services for a 60 days period. Payment: the payment will be performed based on 4 milestones. The milestones will be created immediately after the project is awarded. The milestones will be paid gradualy, one per week (or at 2 weeks), as the documents are set-up in initial versions, and after that revised depending on the support information available from your side. I hope my experience and positive recommendations will be of interest for you. Best regards, Nick.
$2,000 USD in 60 days
4.9 (5 reviews)
3.3
3.3
User Avatar
Hello, I have extensive experience in project management and project scheduling in projects with high complexity, and I am highly proficient in MS Project, with substantial international experience. I have amassed over 15 years of significant experience in civil engineering projects within the construction, in estimation, tendering, proposals and contracts administration of projects at world class companies in different fields such as civil, roads, earth works and infrastructures. My engineering experience has provided me with the opportunity to develop strong client relation, building skills and an ability to lead multi-disciplinary teams. I am experienced at applying the principles of geological engineering and civil engineering when planning, designing, and overseeing the construction and maintenance of structures and facilities. Regards, Laura Jorge
$2,500 USD in 30 days
5.0 (5 reviews)
1.6
1.6
User Avatar
I am a certified Project Manager Professional with more than 20 years of experience managing large capital projects. I can develop the detailed project management plan that you need for the 200 MW Coal fired power station. To define the quickest method for piling construction, Do you have the soil bearing analysis? Where will this be constructed? Is there piling companies close by or do you need to bring a company to the facility to do this job? Do you have the drawing for the 10,000 tonnes structural steel work and and estimate of the timeframe to fabricate this or the task is to bid and get price and delivery time? At the site, Is there a laydown area defined for warehousing, material handlind and unpacking? Please let me know your comments, questions or answers. Kind regards
$2,500 USD in 30 days
5.0 (3 reviews)
1.5
1.5
User Avatar
A proposal has not yet been provided
$1,500 USD in 30 days
0.0 (0 reviews)
0.0
0.0
User Avatar
A proposal has not yet been provided
$2,000 USD in 30 days
0.0 (0 reviews)
0.0
0.0
User Avatar
You need to have core drilling or results from one nearby... As a consulting manager and professional services consultant performing roles of program and project management for eighteen years, I have led and managed development of technical business solutions and application developments for Government Agencies and Businesses, having in-depth experience managing clients’ clients, c-suite and stakeholders along with client’s teams and vendors. Excelled in liaising between executive - business and technical, providing guidance, mentorship and consultative approaches to alignment, contract deliverables and oversight of constraints. Advanced in communication, presentation and writing skills, striving for consistency in artifacts, deliverables and uniform tone of voice; having developed and presented on all business levels and publicly. • Similar project under belt: Retained to develop initial plans and associated documentation for project funding approval and local governance. Oversee development phases (up to ground breaking approval) on several commercial development projects. Conducted pre-planning, site and area analysis for each project, recommendations on vendors. Thereby developing business and operational models (RSMeans). Traveled to Canada, Dominican Republic, and Europe; presenting plans, obtain requirements, negotiate pre-agreements, and securing pre-approval of local government agencies. Managed Vendors, Planned, tracked, and managed of pre-construction project.
$3,000 USD in 30 days
0.0 (0 reviews)
0.0
0.0
User Avatar
DO NOT PAY TILL PROJECT IS COMPLETE! Hi I am Brian, I am from Cyboticx a leading Digital Agency specializing in product + brand development and lead generation optimization. Before getting into more details lets put the following out there, we do not charge before work is complete. We are able to provide references from some of the largest companies in America that we have worked with. We have several branch offices (LA, San Jose, Chicago, and NJ) so you can reach us anytime. We have worked with both large enterprises as well as small mom and pop shops and we value each client equally. Let me know if you would like us to start working on a proper technical document and proposal for your project! You can view our portfolio at https://www.freelancer.com/u/cyboticx.html
$2,577 USD in 30 days
0.0 (0 reviews)
0.0
0.0

About the client

Flag of AUSTRALIA
LAKE HEIGHTS, Australia
5.0
18
Payment method verified
Member since Jan 23, 2010

Client Verification

Thanks! We’ve emailed you a link to claim your free credit.
Something went wrong while sending your email. Please try again.
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759) & Freelancer Online India Private Limited (CIN U93000HR2011FTC043854)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.