
Awarded
Posted
Paid on delivery
I need a protection coordination study completed in SKM Power*Tools for an existing industrial facility. The single-line diagram is ready; what I’m missing is a clear set of time-current curves, device settings, and written recommendations that will raise our safety margin while boosting overall system reliability. You will begin by importing or building the model in SKM PTW, verifying device data, and then running the coordination module. Please evaluate breakers, fuses, relays, and feeders across the entire plant distribution down to 480 V. Once selective tripping and fault-clearing sequences meet IEEE and NFPA 70E guidelines, document all changes and suggest any hardware or setting adjustments necessary to close remaining gaps. Deliverables: • Native SKM PTW project file with all revisions • PDF report summarizing methodology, findings, and recommended settings • Time-current coordination (TCC) curves for every critical protective pair • One-page executive summary highlighting the safety and reliability gains I will consider the study complete when the curves show no unintended overlap, settings tables are ready for field implementation, and the report provides a concise rationale for each recommendation. If you have recent experience with large motor loads, utility tie breakers, and arc-flash mitigation inside SKM, this will be a straightforward assignment.
Project ID: 40414555
6 proposals
Remote project
Active 22 hours ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
6 freelancers are bidding on average $195 USD for this job

⭐⭐⭐⭐⭐ Industrial SKM Protection Coordination ❇️ Hello! After reviewing your project requirements for the Industrial SKM Protection Coordination, I am confident in my ability to deliver a comprehensive protection coordination study using SKM Power*Tools. With substantial experience in electrical engineering and specifically in industrial facility projects, I am well-prepared to enhance the safety and reliability of your system. ➡️ Why Me? I hold a PhD in Electrical Engineering with over 10 years of experience focused on power systems analysis and protective device coordination. My expertise encompasses the use of SKM PTW for detailed system studies, including time-current coordination, device evaluation, and setting optimization. I have successfully completed similar projects that involved complex industrial setups, ensuring compliance with IEEE and NFPA 70E standards. ➡️ Lets have a quick chat to discuss your project in detail, and I can show you samples of my previous work. ➡️ Some of my similar work: ✅ Protection coordination for a 500 MW thermal power plant ✅ Upgrade and retrofit study for multiple substations in an automotive manufacturing plant ✅ Arc-flash analysis and mitigation strategies for a large chemical processing facility ✅ Implementation of system reliability improvements for a multi-site food processing company ✅ Detailed fault analysis and system optimization for a major data center Waiting for your response! Best Regards, Dr. Muhammad Asad
$187 USD in 6 days
8.1
8.1

Hello, I understand you need a complete protection coordination study in SKM Power*Tools, ensuring selective tripping, improved safety margins, and reliable operation down to 480V. I will import and validate your single-line model in SKM PTW, verify all protective device data (breakers, relays, fuses), and run coordination studies across feeders, motor loads, and utility ties. I will adjust time-current characteristics to eliminate overlap, ensure proper fault-clearing sequences, and align settings with IEEE and NFPA 70E guidelines, including arc-flash mitigation considerations. Deliverables will include a fully updated SKM PTW file, detailed TCC curves for all critical pairs, and a structured PDF report outlining methodology, coordination logic, and recommended device settings ready for field implementation. A concise executive summary will clearly highlight safety improvements and system reliability gains. Thanks, Asif
$250 USD in 4 days
5.1
5.1

Hi, I’ve carefully read your requirement for the SKM PowerTools protection coordination study—and I understand you’re not just looking for calculations, but a clean, reliable system with clearly documented settings and no overlap in TCC curves. What I can do for you is make this entire process structured, clear, and implementation-ready. I’ll support building/validating the SKM model, organize device data, and ensure your final outputs (TCC curves, settings tables, and report) are clean, easy to follow, and aligned with IEEE/NFPA guidelines. Beyond just ‘running the study’, I focus on clarity—so your team can actually use the results confidently in the field. That means well-organized coordination results, concise explanations, and a strong executive summary highlighting safety and reliability improvements. If helpful, I can also start with a quick review of your single-line diagram and point out any immediate coordination gaps before we proceed fully. Let’s discuss your system and get this optimized properly.
$140 USD in 2 days
0.6
0.6

Dear , I have experence in SKM: Tcc, Arc tlash, Setting breaker. SKM calculation is my daily task. I can meet your requirements.
$140 USD in 8 days
0.0
0.0

Are you looking for a precise, standards-compliant protection coordination study in SKM Power*Tools that ensures selective tripping, improved safety margins, and reliable plant operation? I’m an Electrical Design Engineer with 5+ years of experience in power distribution, protection coordination, and industrial system analysis. I’ve worked on coordination studies involving breakers, relays, motor loads, and utility interfaces, ensuring compliance with IEEE and NFPA 70E. Approach • Model Verification: Import/build your single-line in SKM PTW and validate all device data • System Analysis: Review breakers, fuses, relays, feeders down to 480 V • Coordination Study: Generate and refine TCC curves to eliminate overlap and ensure selectivity • Settings Optimization: Adjust trip curves, relay settings, and fuse coordination • Safety Review: Align with arc-flash mitigation practices and NFPA 70E guidelines Deliverables • Native SKM PTW project file (fully updated) • PDF report (methodology, findings, recommendations) • TCC curves for all critical protective device pairs • Settings tables ready for field implementation • One-page executive summary (safety + reliability improvements) If you share the single-line and existing device data, I can quickly assess coordination gaps before running the full study. Best regards, Hasan
$200 USD in 5 days
0.0
0.0

Hoffman Estates, United States
Payment method verified
Member since May 3, 2026
$30-250 USD
₹12500-37500 INR
$30-250 USD
$30-250 USD
$250-750 USD
£750-1500 GBP
$30-250 USD
$1500-3000 USD
₹1500-12500 INR
₹1500-12500 INR
min €8 EUR
$30-250 USD
$30-250 AUD
₹1500-12500 INR
₹400-750 INR / hour
£250-750 GBP
$30-250 USD
₹12500-37500 INR
$15-25 USD / hour
$30-250 USD