Find Jobs
Hire Freelancers

ETAP learning videos needed- content creation and delivery on videos

$250-750 USD

Closed
Posted over 4 years ago

$250-750 USD

Paid on delivery
Note: Please don't bid anonymously please share your sample work first to qualify for round 2 Scope of work I need ETAP expert to shoot videos with screen recording on following sections Section 1: Introduction (1 min) Section 2: ETAP Environment 2.1 ETAP toolbars (9 min) 2.2 Drawing Single Line Diagram (8 min) 2.3 Rating Components (8 min) 2.4 Presentation toolbar (3 min) Section 3: Load Flow analysis 3.1 Load Flow analysis – I (4 min) 3.2 Load Flow analysis – II (8 min) 3.3 Load Flow analysis – III (7 min) Section 4: Short circuit analysis 4.1 short circuit analysis – I (1 min) 4.2 short circuit analysis – II (6 min) Section 5: Arc flash studies 5.1 Arc Flash studies – I (3 min) 5.2 Arc flash studies – II (10 min) Section 6: Transient stability analysis 6.1 Transient stability analysis – I (14 min) Section 7: Harmonic analysis 7.1 Harmonic analysis – I (6 min) 7.2 Harmonic analysis – II (7 min) 7.3 Harmonic analysis – III [Filter sizing] (6 min) Section 8: Motor acceleration analysis 8.1 Motor acceleration analysis I – Static motor starting (11 min) 8.2 Motor acceleration analysis II – Dynamic motor starting (8 min) 8.3 Motor acceleration analysis III - Motor starter (7 min) 8.4 Motor acceleration analysis IV – VFD [variable frequency drive] starting (11 min) Section 9: Ground Grid Systems 9.1 Ground Grid systems (9 min) 9.2 Ground Grid systems – IEEE 80 (10 min) 9.3 Ground Grid systems – FEMA (8 min) Section 10: Cable pulling systems 10.1 Cable pulling systems – I (8 min) 10.2 Cable pulling systems – II (14 min) 10.3 Cable pulling systems – III (4 min) Section 11: Underground raceway systems 11.1 Cable ampacity (12 min) 11.2 Underground raceway systems (11 min) Section 12: Protective device coordination 12.1 Coordination basics (14 min) 12.2 Protection coordination – I (31 min) 12.3 Protection coordination – II (11 min) 12.4 Protection coordination – III (16 min) Section 13: Protection schemes 13.1 Bus bar differential protection (9 min) 13.2 Transformer differential protection (6 min) 13.3 Motor protection (20 min) 13.4 Directional overcurrent protection (7 min) 13.5 Over and Under Voltage protection (4 min) 13.6 Over and Under frequency protection (4 min) 13.7 Reverse power protection (5 min) Section 14: Revision and Wizard toolbar 14.1 Revision control (5 min) 14.2 Wizard toolbar (6 min) Section 15: DC power systems 15.1 DC load flow (10 min) 15.2 DC short circuit and arc flash (7 min) 15.3 Battery sizing calculation (8 min) Section 16: Renewables 16.1 Photovoltaic systems (14 min) 16.2 Wind Power (9 min) Section 17: Advanced power systems studies 17.1 Optimal power flow (14 min) 17.2 Unbalanced load flow (13 min) 17.3 Optimal capacitor placement (6 min) 17.4 Switching sequence management (15 min) Section 18: DC control systems 18.1 DC control wiring systems (16 min) Section 19: Advanced practical projects 19.1 Transient stability (10 min)
Project ID: 23711206

About the project

1 proposal
Remote project
Active 4 yrs ago

Looking to make some money?

Benefits of bidding on Freelancer

Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs

About the client

Flag of JAPAN
Heiwajima, Japan
0.0
0
Payment method verified
Member since Jan 16, 2020

Client Verification

Thanks! We’ve emailed you a link to claim your free credit.
Something went wrong while sending your email. Please try again.
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759) & Freelancer Online India Private Limited (CIN U93000HR2011FTC043854)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.