ETAP learning videos needed- content creation and delivery on videos
$250-750 USD
$250-750 USD
Paid on delivery
Note: Please don't bid anonymously please share your sample work first to qualify for round 2
Scope of work
I need ETAP expert to shoot videos with screen recording on following sections
Section 1: Introduction (1 min)
Section 2: ETAP Environment
2.1 ETAP toolbars (9 min)
2.2 Drawing Single Line Diagram (8 min)
2.3 Rating Components (8 min)
2.4 Presentation toolbar (3 min)
Section 3: Load Flow analysis
3.1 Load Flow analysis – I (4 min)
3.2 Load Flow analysis – II (8 min)
3.3 Load Flow analysis – III (7 min)
Section 4: Short circuit analysis
4.1 short circuit analysis – I (1 min)
4.2 short circuit analysis – II (6 min)
Section 5: Arc flash studies
5.1 Arc Flash studies – I (3 min)
5.2 Arc flash studies – II (10 min)
Section 6: Transient stability analysis
6.1 Transient stability analysis – I (14 min)
Section 7: Harmonic analysis
7.1 Harmonic analysis – I (6 min)
7.2 Harmonic analysis – II (7 min)
7.3 Harmonic analysis – III [Filter sizing] (6 min)
Section 8: Motor acceleration analysis
8.1 Motor acceleration analysis I – Static motor starting (11 min)
8.2 Motor acceleration analysis II – Dynamic motor starting (8 min)
8.3 Motor acceleration analysis III - Motor starter (7 min)
8.4 Motor acceleration analysis IV – VFD [variable frequency drive] starting (11 min)
Section 9: Ground Grid Systems
9.1 Ground Grid systems (9 min)
9.2 Ground Grid systems – IEEE 80 (10 min)
9.3 Ground Grid systems – FEMA (8 min)
Section 10: Cable pulling systems
10.1 Cable pulling systems – I (8 min)
10.2 Cable pulling systems – II (14 min)
10.3 Cable pulling systems – III (4 min)
Section 11: Underground raceway systems
11.1 Cable ampacity (12 min)
11.2 Underground raceway systems (11 min)
Section 12: Protective device coordination
12.1 Coordination basics (14 min)
12.2 Protection coordination – I (31 min)
12.3 Protection coordination – II (11 min)
12.4 Protection coordination – III (16 min)
Section 13: Protection schemes
13.1 Bus bar differential protection (9 min)
13.2 Transformer differential protection (6 min)
13.3 Motor protection (20 min)
13.4 Directional overcurrent protection (7 min)
13.5 Over and Under Voltage protection (4 min)
13.6 Over and Under frequency protection (4 min)
13.7 Reverse power protection (5 min)
Section 14: Revision and Wizard toolbar
14.1 Revision control (5 min)
14.2 Wizard toolbar (6 min)
Section 15: DC power systems
15.1 DC load flow (10 min)
15.2 DC short circuit and arc flash (7 min)
15.3 Battery sizing calculation (8 min)
Section 16: Renewables
16.1 Photovoltaic systems (14 min)
16.2 Wind Power (9 min)
Section 17: Advanced power systems studies
17.1 Optimal power flow (14 min)
17.2 Unbalanced load flow (13 min)
17.3 Optimal capacitor placement (6 min)
17.4 Switching sequence management (15 min)
Section 18: DC control systems
18.1 DC control wiring systems (16 min)
Section 19: Advanced practical projects
19.1 Transient stability (10 min)
Project ID: 23711206
About the project
1 proposal
Remote project
Active 4 yrs ago
Looking to make some money?
Benefits of bidding on Freelancer
Set your budget and timeframe
It's free to sign up and bid on jobs