Hi, and thanks for considering my bid.
I am an electrical engineer skilled and experienced in worst-case circuit analysis (WCCA), worst-case performance analysis, and reliability analysis. I have recently completed the following projects:
WCCA of Timer Circuit: this circuit was performing the power monitoring in an FPGA device. The core job of the circuit was to trigger a power cut for a certain amount of time if the DC power supply becomes unable to supply a specified amount of power (voltage and current ratings), specifically during the system startup and shutdown operations. The timing was being set using capacitors and resistors. I analyzed the circuit to determine minimum and maximum off-times under extreme temperature and aging conditions.
Similarly, I performed WCCA for current monitoring ICs and power converter ICs.
So, because of my knowledge and experience, I can determine Ffr for any component and circuit. The Efr could typically be a function of temperature, humidity, radiation, aging, etc. In some literature, determining the failure rate is known as EVA (extreme value analysis).
Given specific project requirements, I will be able to put forth a definite plan of action for the project.
Thanks again for considering my bid. I am waiting for your kind response.
Regards,
Ghulam Shabbir